Show
Recommended textbook solutionsNumerical Analysis9th EditionJ. Douglas Faires, Richard L. Burden 873 solutions Book of Proof2nd EditionRichard Hammack 340 solutions A Concise Introduction to Logic12th EditionPatrick J. Hurley 1,933 solutions Introductory Combinatorics (Classic Version)5th EditionRichard A. Brualdi 685 solutions Which phase of the systems development life cycle includes transforming the plan from the design phase into an actual functioning system?Which phase of the systems development life cycle includes transforming the plan from the design phase into an actual, functioning system: Implementation Phase. The final phase of the systems development life cycle is the: Maintenance phase.
Which phase of the SDLC involves a complete detailed review of the systems needs of the end user?The analysis phase of the SDLC involves a complete, detailed analysis of the systems needs of the end user.
Which phase of the SDLC involves placing the system into production such that users can actually use the system that has been designed for them?Implementation
This phase also involves the actual installation of the newly-developed application. The project is put into production by moving all components and data from the old system and putting them in a new one through a direct cutover.
Which phase of the SDLC involves development and testing of the system?5. Integration and Testing. The fifth phase involves systems integration and system testing (of programs and procedures)—normally carried out by a Quality Assurance (QA) professional—to determine if the proposed design meets the initial set of business goals.
|